Skip content

Search for a WIRS accredited self-lay organisation or WIRSAE provider

We operate the Water Industry Registration Scheme (WIRS) on behalf of water utility companies and the WIRSAE accreditation on behalf of Market Operator Services Ltd (MOSL) and water wholesalers.

A WIRS accredited self-lay organisation may perform works on the connection of water mains and supplies to a property, dependent on the status and scope of accreditation.

A WIRSAE Provider contracted by retailers to carry out accredited work (as defined in the Wholesale Retail Code and detailed in the generic code of practice supplemented by adopting utilities addendums) can be accredited under this scheme. Those Adopting Utilities within England that recognise this scheme will allow WIRSAE Providers that hold the appropriate scopes of accreditation to tender for, and if successful undertake temporary / permanent disconnections and meter installation / replacement works.

1 251 251 results

Filter by

  • OPUS Utility Solutions Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Gavin O’Connor

  • Stantec UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Paul Kalungi

  • M&S Water Services (Utilities) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Thomas Harkin

  • Advance Utilities (Scotland) Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Callaghan

  • E&H Building Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Drewie Manson

  • AS-Utilities Scotland Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Scott Peters

  • Morris & Bert Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Morris

  • Complete Moling Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Adam Thompson

  • UK Power Solutions Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Brian Cooke

  • Dewhurst Utility Services Ltd -MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Jason Critchley

    Contact

    Bill Jones

    Notes

    GIRS - Connections (Non-Routine) Basic (Scope limited to projects up to 2Bar)

  • Firdale Construction Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Dumfries and Galloway Utility Company Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Carruthers

  • Mott Macdonald

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Stephen Kirby

  • Aquamain (UK) Ltd

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Luke Welch

  • JWA Pipework Solutions Ltd

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jay Ashford

  • SmOp CT Ltd (trading as SmOp Cleantech)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Craig Morton

    Notes

    Civil Works - Excavation and Backfill to Tile Tape Level

  • Terrafirma Pipeline Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CRMC Construction of Routine Mains Connections

    CMS – Construction of Mains and Services (site works only)

    Contact

    Ivor Wells

  • AIM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Simon Barton

  • A S Pipelines

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Andrew Croft

  • ACS Multi Utility Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alister Cameron

  • BGS Group Ltd (BGS Investment Holdings Ltd.)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Hopkins

  • PN Daly Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Patrick Daly

  • Network Plus Services Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Assurance Team

  • Hulley and Kirkwood Consulting Engineers Ltd

    Regions Scotland

    WIRS

    Design

    Contact

    William Fitzpatrick

  • Morrison Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Iain Mitchell

    Contact

    Drew Mackie

  • PWG Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Notes

    Network Connections Operational – LV and 11kV (includes 20kV) Network Connections Jointing – 11kV mains and 11kV Terminations (includes 20kV)

  • Hydro Utility Solutions Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mr Tim Stork

  • Capelwood Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Tristan Epps

  • United Living Water Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Carolan

  • Fincher Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Matrix Networks Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Simon Spencer

  • Watertight Management Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Castle

  • GCB Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Bennett

  • F W Huxter Groundworks and Civil Engineering Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Express Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kerry McDade

  • JRF Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • GTC Infrastructure Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

  • Quantum Power Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • PowerTek Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Fraser Baxter

  • Erith Connect Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Innovative Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr John Mason

  • Dwr Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Harri Pritchard

  • Water and Pipeline Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Donald Stocks

  • Integrated Utility Services - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Integrated Utility Services Ltd

    Notes

    Civil Works Associated with Cable Laying (LV, 11kV, 20kV, 33kV & 66kV)

  • Sustainable Energy Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andrew Holland

  • Water Supply Surveys Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stephen Elliott

    Contact

    Kane Trayling

  • Argon Utility Infrastruture Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Beth Taylor

  • Electricity Asset Service Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Stewart Herron

  • AC Water Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Claire Lineham

  • McAndrews Utilities and Civil Engineering

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean McAndrew

  • WSP UK Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Tim Knobbs

  • Domis Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lee Dunn

  • JSM Group Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Darren Cooper

  • GasDesign Utilities Ltd Trading as GDUK (Utilities)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Andy Ginn

  • Pressure Test scotland (Water) Ltd

    Regions Scotland

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    David Connell

  • John Gunn & Sons Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ian Gunn

  • Kilkern Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Martin Gallagher

  • Aptus Utilities - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Enquiries Team

    Notes

    GIRS Connections (Non-Routine) Basic - restricted to projects up to 2 Bar

  • S&R Construction Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Danny Scholes

  • Reach Active Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

  • NG Tunnelling Ltd

    Regions East Anglia, South East

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Peter Gallagher

    Notes

    13/06/2024 Suspended

  • Air Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Muhammad Asfund Yar Khan

  • W M Donald Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Rachel O’Donnell

  • Chap Group (Aberdeen) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neil Mutch

  • Pipework Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Vallely

  • RPS Environmental Management Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

  • AIS Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Stuart Newton

  • Alexander James Contracts Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Utility Infrastructure Solutions - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Grayson

    Notes

    GIRS:- Connections (Non-Routine) Basic - Recommended for partial certification (restricted to work up to 2Bar only)

  • O'Halloran & O'Brien Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    David Briddon

  • DAM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Barhale Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Kelly Waters

  • Fusion Utility Networks

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Smith

  • Ian Moore Groundworks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Luce Bay Plant Hire Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • JN Civils Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Antony Livingstone

  • Longsword Building and Maintenance Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Tulloch Developments Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Shaun Tulloch

  • Total Pipeline Technology Civil Engineering Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Creamer

  • Nexus Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    John Gaughan / Stephen Gaughan

    Notes

    Administration September 2025

  • Allan Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Cameron Munro

  • Claret Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Potter

  • M&J Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Buxton

  • CMU Infrastructure Ltd incorporating CM Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    CMU Infrastructure Ltd incorporating CM Utilities Ltd

  • Green Frog Utilities

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Green Frog Utilities

  • ARC-Tech MU Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Hunter

  • Hydrosave UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Mr Keith Lewcock

  • Bethell Utility Services Ltd - MURS Accredited

    Regions Midlands, North East, North West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Sarah Standish

  • Onsite Central Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Catherine Henderson

  • William Davis

    Regions Midlands

    WIRS

    CS - Construction of Services

    Contact

    Richard Halford

  • The ICP

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • K M Plant Hire & Groundworks Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Murray Ambler-Shattock

  • Harlaxton Engineering Services Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Richard Hibbert

  • Sapphire Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    John Glover

    Notes

    Partial Accreditation - Excavation and backfill to tile tape level (Civil Work) – as relevant Cable Laying – 20kV, 33kV

  • PBU (UK) Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Kevin Wilkinson

  • Billy Miller Contractor & Plant Hire

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Brad Robert Macleod

  • IES Utilities Group

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Multi Connex Networks Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Pat Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Gary Clark

  • Beehive Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Skanska Construction UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Raj Kumar

  • Excel Pipelines T/A ExcelCS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Mark Barnes

  • J McCann & Co Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDaid

  • Infrastructure Gateway - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Ben Brownbill

  • Alconex Infrastructure & Solutions Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kevin Wilkinson

  • FES Support Services Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Chris Mack

  • USR Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Arcadis Consulting (UK) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Gareth Thompson

  • Interactive Contact & Resolution Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    Contact

    Richard Denny

  • M X Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • Cascade Water Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Hedges

  • Underground Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • MCU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mick Coleman

    Notes

    NERS Cable Laying (LV) *restricted to hand pull only

  • Morrison Data Services - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    ARMIM Temp disconnections/reconnections

    Contact

    Mr Matthew Barnes

  • Avove Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Liz Groundland

  • Versatile Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Wayne Gould

  • Rogers Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Natalie Birch

    Notes

    Full Scopes Construction Only - Excludes Project Management

  • Ipsum Power (ICP) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lucy Jarrett

  • Perch Verify Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

  • Pro Weld

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Allan Davidson

  • FCH Construction Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Fraser Hart

  • Power On

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim Erich

  • Connect It Utility Services Limited - MURS Accredited

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ryan Leech

  • Special Pipeline Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mick Rice

  • Vital Energi Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim McNeilly

  • Ameon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Martin Quinn

  • Applebridge Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Tomas McGleenan

    Notes

    NERS = Excavation and backfill to tile tape level as relevant to cable lay scopes (Civil Works). GIRS = CNRB Scope restricted to work up to 2 Bar.

  • Pipeline Energy Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Notes

    NERS Tier 2 Company

  • Fulcrum - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Customer Care

  • L J Heffernan Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Luke Heffernan

  • DaCI Utilities Engineering Consultancy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mohammad Hasan

  • Waterco Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Accounts

  • SNR Eng Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Richard Kibbler

  • Bregan Mainsflow Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Glenn Brett

  • UK Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Pitts

  • PJ Carey (Contractors) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Larham

  • Seivwright Brothers Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alasdair Seivwright

  • Davidson Land Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Malcolm Davidson

  • The Clancy Group Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Malcom Hazel

    Notes

    .

  • PGL Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Davis

  • Naylor Power Engineering Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Spink

  • M.J. ABBOTT LIMITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Adrian Riggs

  • Rosgal Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • SAS Utility Services Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mr Stephen Smith

  • Entity Connect

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Gethin Davies

  • DT Civils Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Dean Sibley

  • Montore Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Dan Sutton

  • Doocey Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Ashcroft

  • Severn Trent Services

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Nathan Beauchamp

  • Trust Utility Management Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Pivotal Energy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Amie Norton

  • Talbot Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Talbot

  • TriConnex Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Hannah Smith

  • Complete Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Damon Goodwin

  • Kier Integrated Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    KIS Proposals

  • High Voltage Systems and Services (HVSS)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mark Buckby

    Contact

    Chris Beattie

  • CONNECT3UK LTD

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ainsley McLaughlin

  • GS Energy Connections Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Danny Dunstan

  • ML Water Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Richard Moffat

  • Self-Lay Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Toby Judge

  • Hydrotech Water Services UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Vince Keenor

  • Electricity Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Bergin

  • EOS Solutions UK Plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    ARMIM Temp disconnections/reconnections

    Contact

    Steve Ridge

  • Utilitest Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alan Macmillan

  • GW Cockburn Water and Drainage Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr Gary Collins

  • Balfour Beatty plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Steve Crossland

  • Energetics Design and Build Limited - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Lee Crabtree

    Notes

    Civil Works associated with the following scopes: Cable Laying (LV, 11kV, 20kV) Cable Jointing (LV Dead, LV Live, 11kV, 20kV) Substation Installation (11kV, 20kV)

  • Mulholland Contracts Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Scott Lambie

  • Networx Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Brimicombe

  • J Murphy and Sons Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Sam Polley

    Notes

    Full accreditation for Substation Layouts (11kV, 20kV, 33kV – restricted to 33kV switchgear)

  • Therma Mech Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alex Sargeant

  • JPS Utilities (Scot) Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lesley Allan

  • Natta Building Company Limited

    Regions Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Utilities

  • M Group Water (Network Infrastructure) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andy Stephenson

  • Future Energy Networks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Bret Murphy

  • Bottom Groundworks & Plant Hire Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Brian Campbell

  • Energy Flow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • DJM Services (Pembs) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Darrell Lewis

  • Swat Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Jake Pariente

  • Galldris Services (trading as Galldris Construction Ltd.)

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Chris Turok-Hallam

  • J Geraghty Limited

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Jonjo Geraghty

  • PTS Utilities Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Richard Paton

  • Heartland Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Robert Ellis

  • Utilities Direct Limited

    Regions East Anglia, Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Loretta Gobbey

  • Engage Services (ESL) Limited - WIRSAE

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Neil Taylor

  • Nicol of Skene Ltd - MURS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Peter-Jon Cowe

  • Megson Utilities Limited - MURS accredited

    Regions Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Megson

    Notes

    (Civil Work) – as relevant to Construction: Cable Laying – LV, 20kV.

  • Radius Subterra

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Garvan Kelly

  • Chapman Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Chapman

  • Prestige Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • UB Civils Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Colin Peteranna

  • Heneghan and Sons Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDermott

  • Ipswich Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Jordan Thomas

  • JRN Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Nelson

  • McFadden Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean Staines

  • GF Job

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ruaridh Stuart

  • CLC Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Freddie Box

    Contact

    Thomas Stoten

  • Phoenix Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

    Contact

    Mr Kenny Nicol

  • Underline Utilities & Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Michael Plausin

  • Gattica Associates Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mihaela Gafita

  • Andrew Sinclair Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Design

    Contact

    Bruce Sinclair

  • Total Utility Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Catherine Rowlands

  • Flowaime Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Andrea Wright

  • Balfour Beatty Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Notes

    Water enquiries Kathryn Vowles, contact details as above. Gas enquiries Willie Duncan, contact details as above.

  • Jardine Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Jardine

  • OCU Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • Occutrace Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    MIRMS

    Installation or replacement of meter in chamber/box up (to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    ERMIM - Temporary Disconnections and Subsequent Reconnections

    MIAES - Installation or replacement meter in existing chamber / inside building up to and including 40mm

    MIAEL - Installation or replacement meter in existing chamber / inside building over 40mm.

    Contact

    David McKenzie

  • Utility Solutions Provider Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neal Cowdell

  • TGL Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • OCU Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    James Probert

  • Draper Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Edward Parv

  • Pipeline Associates Ltd

    Regions South East, South West

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Dan Woolmington

  • Pearce Elite Plumbing & Heating Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Matthew Duggan

  • WaterWise Utilities Ltd (formerly DS Construction (Scotland) Ltd )

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Energy Assets Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Smith

  • Civils Plus Plant and Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Rachel Carroll

  • J.S. Pipelines Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Jamie Smith

  • HydroVein (North Avon Group) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • Amjutan Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mr Justin Woodbridge

  • Excalon Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Danny Wilson

  • Shannon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ben Webb

  • Dig & Connect Water Services Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mark Aldous

  • Anparo Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Adam Ferrand

  • Global Infrastructure Scotland Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Tanya Bartlet

  • Ingenious Power Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Jason Johnson

  • MCD Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Donovan Aylott

  • TSL Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Robert Forbes

  • Stats Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Design

    Contact

    Neil Kempton

  • Shadow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • EEMU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

Error

Error

No results found

No results found that match your query

Loading results

Approval Key

full approval

Full Accreditation is granted to Providers who have successfully demonstrated that they have adequately met the schemes requirements with respect to the construction of adoptable assets, these Scopes and Services are highlighted in green when fully accredited.

partial approval

Partial Accreditation is the first stage of accreditation showing Scopes and Services highlighted in blue. It demonstrates that a Provider has the required systems, processes, and procedures in place, but has yet to demonstrate these or is currently unavailable to offer work for surveillance to meet the requirements. Providers with partial accreditation can tender and obtain work for the scopes they hold.

approval due to expire

Scopes highlighted in yellow are fully accredited but are due to expire in less than one month.

gap analysis

Scopes highlighted in aqua are for GAP Analysis, meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval expired

Scopes highlighted in fuchsia have now expired or have been suspended.

bim ready

BIM Providers who can demonstrate that they have met the requirements of the BIM Guidance document and the referenced standards but do not currently have BIM projects against which they can demonstrate the implementation of those standards

    WIRS Scopes

    Design

    CMS Construction of Mains and Services - All works
    Covers off-site work and on-site work with pipe diameters over 355mm diameter

    CMS Construction of Mains and Services - Site works only
    Covers work on development sites with mains up to 355mm diameter

    CMS Construction of Services on Development Sites
    This scope covers service laying on connections not exceeding 63mm diameter (OD) including services to new on-site mains laid by others.

    PM
    Procedures in place to manage the work and use companies holding construction accreditation.